Our house at this stage: it’ll keep the wolves out, but not much in the way of amenities. Note the yellow flowers of the creeping Scotch broom invasion among our remaining building materials.
At this point there were a number of pieces of the house and environs in various stages of completion, and we decided to focus on completing a few of the unfinished pieces over the next couple of weeks. Lee had a business trip to Korea during the first half of May, so Kestrel spent that time playing with her bees. The next thing we wanted to do was finally finish the interior framing and ceiling of the house. This would let us use up a lot of the lumber that was currently taking up space in what was going to be the bedroom.

The interior, with a big pile of lumber where our bed will eventually sit and the saddest sawhorse doing duty as a tool bench in the future bathroom.
Before framing, we had to stain and seal the interior walls. This was done over time during the less pleasant rainy days of the solar building construction. As part of this process, any water stains on the walls left there from exposure to the rain earlier in the building process were sanded out.
The project after Lee returned from his trip was interior framing. This was pretty standard stuff. The walls were measured, the boards cut, and the 2×4 stud walls were nailed together in the large area that will become the greatroom. We then tilted them into place and nailed them into the ceiling, floor and walls.

The biggest wall in the house – the stud separation between the bathroom and the bedroom. Lee decided to cheat this in as close as possible on the bathroom side to get a few extra inches of bedroom space beyond what was in the house blueprints.
The next week was Kestrel’s birthday! Lee got her a propane grill so we could start cooking hot food up at the house while we’re working on the weekends, and a picnic table so we wouldn’t have to eat on camp chairs. The ability to cook up there was starting to make it feel more like a home.
When it wasn’t raining, Lee spent some time finishing up the solar building. He installed a rough frame that will allow us to pass long lumber into the building without needing to negotiate it around a corner, and put a Plexiglas window on it to keep out the rain. The plan was to install a set of metal racks inside the long, narrow building and use it to store excess lumber out of the weather in addition to its primary purpose of holding solar panels, batteries, and the inverter/charge controller box.
Lee also painted the building, both because cinder block grey is a little too post-apocalyptic for our particular aesthetic and because CMU’s are porous and a layer of paint helps them better shed water.

The day was so nice that Tom Sawyer would have little trouble convincing people to paint his fence. In this allusion, Kestrel is Tom Sawyer.
We also finally got rid of most of the rest of our tongue and groove ceiling material by covering up the second half of our insulation. As with the other half of the ceiling, Kestrel cut and Lee installed. Kestrel wasn’t quite tall enough to get the upper boards from the top of the ladder, and it was starting to get awkward for her to move around while carrying large objects.
Finally, a long-awaited piece of equipment arrived during the week – our wood stove! We spent some time picking out a stove that was not too large for our little house, didn’t require too much clearance form flammable objects, but also had enough cooking surface and an oven. The one we went with was the Vermont Bun Baker, and after living with it for a couple of winters now (spoiler alert) we can highly recommend it. More immediately, however, this thing was 350lbs of cast iron that needed to be put in place on the tile hearth Lee had installed back in January.

Kestrel records the scene for posterity. Lee kind of just wants to finish getting the thing into the house.
Since the stove weighed more than both of us combined and in any case Kestrel was forbidden from lifting more than 25 pounds, we had to use some creativity to get it inside. In the end, we went through a process in which Lee would rock the stove up onto one side and Kestrel would shove some random scrap of building materials under it, then Lee would rock it the other way and the process would repeat. This way about 1.5 inches at a time we lifted the stove the 2 feet or so from the ground to the floor level of the house.

The road to building your own house is paved with lumber scraps in various states of disrepair. Not poetic, but fairly accurate.
We then had to move the thing across the plywood floor without gouging holes all the way through it. This was achieved by laying a path of scrap lumber left over from other pieces of the house and pivoting the stove into place corner by corner. Kestrel guided the stove while Lee provided the motive force. Finally, however, we got it in place. Where it has sat to this very day.